[1]
Dhuha M. Dawood, Abd, A.M. and Zehawi, R.N. 2023. Forecasting Final Cost and Time Rates of Highway Construction Projects in Iraq Using Regression Analysis. Diyala Journal of Engineering Sciences . 16, 4 (Dec. 2023), 142–156. DOI:https://doi.org/10.24237/djes.2023.160412.