H. Ali , M., & M. Abd, A. . (2021). Using of an Artificial Neural Networks with Particle Swarm Optimization (ANN-PSO) Model in Prediction of Cost and Delay in Construction Projects. Diyala Journal of Engineering Sciences, 14(3), 78–93. https://doi.org/10.24237/djes.2021.14307