“Using of an Artificial Neural Networks With Particle Swarm Optimization (ANN-PSO) Model in Prediction of Cost and Delay in Construction Projects”. 2021. Diyala Journal of Engineering Sciences 14 (3): 78-93. https://doi.org/10.24237/djes.2021.14307.