“Using of an Artificial Neural Networks with Particle Swarm Optimization (ANN-PSO) Model in Prediction of Cost and Delay in Construction Projects” (2021) Diyala Journal of Engineering Sciences, 14(3), pp. 78–93. doi:10.24237/djes.2021.14307.