H. Ali , M. and M. Abd, A. . (2021) “Using of an Artificial Neural Networks with Particle Swarm Optimization (ANN-PSO) Model in Prediction of Cost and Delay in Construction Projects”, Diyala Journal of Engineering Sciences , 14(3), pp. 78–93. doi: 10.24237/djes.2021.14307.